• English
    • العربية
  • English 
    • English
    • العربية
  • Login
View Item 
  •   DSpace Home
  • Faculty of Engineering & Technology
  • Projects
  • Petroleum Projects
  • View Item
  •   DSpace Home
  • Faculty of Engineering & Technology
  • Projects
  • Petroleum Projects
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Nameless Field (bahariya formation) Western Desert of egypt

Thumbnail
View/Open
one-page-program-A31 (5).pdf (711.1Kb)
abdelrahman.pdf (4.192Mb)
Abstract (66.19Kb)
Date
8/1/2016
Author
Holiel, Mahgob, Ismail (supervisor)
Eldosaky, Salem, Adel (supervisor) IBRAHIM ( supervised)
Bekhit, Hamada, Ghareb Abdallah
Metadata
Show full item record
Abstract
This field is faulted anticline structure located in the Western Desert. The field produces from different layers mainly shaly sand and sand with different thickness. The main producing formation is Baharyia which will present the main target formation. This report is talking about evaluation and development of an x-field area on Baharyia formation western desert in Egypt with several drilled wells, The development will occur according to the study of geology and the volumetric estimate, offset data of drilled well in the field to design a well in order to achieve all of the required technical data during and post drilling operations as well as been reservoir friendly by meaning of minimizing reservoir impairments and damaging , formation evaluation, reservoir engineering, and production engineering. The study and the evaluation on the x-field will give a view of next step of reserve calculation and development plans to start water flooding development based on the interpretation of the given items.
URI
http://dspace.fue.edu.eg/xmlui/handle/123456789/51
Description
Target:Apply the ideal ways to evaluate and development of a field area BAH formation And ideal way to design a well in order to achieve all of the required technical data during by meaning of minimizing reservoir impairments and damaging. Given Data:* Regarding offset Data Requirements:*Volumetric Estimation *Formation Evaluation *Drilling Prognosis *Tubing Size Selection *Suitable Artificial Lift System
Collections
  • Petroleum Projects [21]

DSpace software copyright © 2002-2016  DuraSpace
Contact Us | Send Feedback
All rights reserved to 
Atmire NV
 

 

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

LoginRegister

DSpace software copyright © 2002-2016  DuraSpace
Contact Us | Send Feedback
All rights reserved to 
Atmire NV