• English
    • العربية
  • English 
    • English
    • العربية
  • Login
View Item 
  •   DSpace Home
  • Faculty of Engineering & Technology
  • Projects
  • Structural Engineering and Construction Management , civil Projects
  • View Item
  •   DSpace Home
  • Faculty of Engineering & Technology
  • Projects
  • Structural Engineering and Construction Management , civil Projects
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

La Villette

View/Open
La Villette.pdf (32.06Mb)
Date
2017
Author
Mohsen, Karim Alaa
Galal, Mohamed Ismail
Naga, Mohamed Ali
sayed, Ahmed Ibrahim
Abd El Aziz, Kareem Ahmed
Awad, Ibrahim Mohamed
Mohamed, Mohamed Ahmed
Metadata
Show full item record
Abstract
The importance of this graduation project is to perform a management plan for Villette Compound owned by SODIC. The first chapter discusses the Project Scope. The second chapter includes site lay out and places of stores and entrances. The third chapter discusses the contract analysis advantages and disadvantages. The fourth chapter discuss the Quantity surveying for each item. The fifth chapter includes The Method of Construction carried out in the execution of work and production rate of labors And equipment. The sixth chapter is about planning (major plan and detailed plan). The seventh chapter discusses resources management (labor, material and equipment). The eighth chapter discusses time estimate. The ninth chapter estimate discuss analysis cost .the tenth chapter discuss cost control. The eleventh chapter discusses the risk management plan; also risk processes were Developed to analyze the possible risks and offer a response that would decrease the risk Impact in case it becomes certain. The twelfth chapter is about Health, Safety and Environmental. The thirteen chapter quality control that discusses the quality control and quality assurance process, to ensure that the required level of quality is met. The fourteen chapter discusses means of Communication in the company and a suggested communication plan
URI
http://repository.fue.edu.eg/xmlui/handle/123456789/5060
Collections
  • Structural Engineering and Construction Management , civil Projects [46]

Related items

Showing items related by title, author, creator and subject.

  • Thumbnail

    West Entertainment Hub 

    Sewilam, Ahmed Ayman; Mongy, Ahmed Yasser; Abd-Elwahab, Ebrahem Mohamed; Ahmed, Mohamed Hani; Mohamed, Mohamed Makky; Ahmed, Mohamed Sameh; Eldmeiry, Mohamed Samir (Future University In Egypt, 2013)
  • Thumbnail

    Elswedy for cement (second production line) 

    Azab, Farag, Salem Khaled Mohamed; Mohamed, Hossny, Basel Mohamed Salah; Taha, Mahdi, Ibrahim Mohamed Mohamed (2016-07-25)
    Constructing the second production line of Elsweedy company for Cement
  • Thumbnail

    Tag Sultan 

    Fouad, Ali, Mohamed Ahmed Mohamed Hossam Mohamed; Ghaith, Hassan, Mostafa Mohamed Mohamed Fathi; Rabie, Mahdi, Ibrahim Eslam Abdelrazek; Elhegazy, Hosam (7/25/2016)
    PROJECT NAME: TAG SULTAN PRJECT SITE: West of the intersection of ring roda is located with cairo-suze road OWNER: Madinet nasr housing Consultant: MOHARM-PAKHOM CONTRACTOR: Misr engineering development PROJECT TOTAL ...

DSpace software copyright © 2002-2016  DuraSpace
Contact Us | Send Feedback
All rights reserved to 
Atmire NV
 

 

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

LoginRegister

DSpace software copyright © 2002-2016  DuraSpace
Contact Us | Send Feedback
All rights reserved to 
Atmire NV