complete filed design
Date
8/2/2016Author
Saif El-din, Mahgob, Ismail Mohamed Shazly
Eldosaky, Salem, Adel Ibrahim
Bekhit, Hamada, Ghareb Abdallah
Metadata
Show full item recordAbstract
Throughout its life cycle from exploration to abandonment, an oilfield requires the participation of many different specialists, working in teams, to make major investment and operating decisions. These decisions must be made under conditions where reservoir data is sparse and uncertainties exist not only about the costs and future performance of the asset, but also with respect to the future price and market demand for the produced oil and gas.
This report is talking about evaluation and development of an x-field area on Bahariya 1 formation western desert in Egypt with several drilled wells, The development will occur according to the study of geology and the volumetric estimate, offset data of drilled well in the field, formation evaluation, reservoir engineering, and production engineering. The study and the evaluation on the x-field will give a view of next step of reserve calculation and development plans to start water flooding development based on the interpretation of the given items.
Description
Target: Filed evaluation and development Give Data: regarding offset Data Requirement :*Volumetric Estimation *Formation Evaluation *Drilling Prognosis *Tubing Size Selection *Suitable Artificial Lift System * Development plan
Collections
- Petroleum Projects [21]